Subcontractor Portal

Current Bid Opportunities

Check out the current projects we are looking at!

If you have questions or need additional assistance, please contact bids@ngcgroupinc.com


Comfort Inn and Suites - North Platte

Scope of Work

Plans call for the construction of a 4-story wood framed, 90 room Comfort Inn and Suites in North Platte. Nebraska.  All site work to be included in this bid letting.

Project Documents

Post Date Bid Date Start Date Completion Date
April 02, 2018 May 01, 2018 @ 2:00 PM Summer 2018 TBD

Aloft - Sioux Falls, SD

Scope of Work

The project consists of a new 4 floor, 104-guestroom, wood framed Aloft hotel. Construction is a wood framed hotel with exterior walls consisting of a combination of aluminum and glass storefront, metal panel siding, and EIFS with a single-ply, directly adhered, light colored roof system.

Questions due to NGC by 5/1/18 @ 12 pm

Project Documents

Post Date Bid Date Start Date Completion Date
April 17, 2018 May 8, 2018 @ 2:00 PM Summer 2018 TDB

Starbucks - Fargo, North Dakota

Scope of Work

Construction of a new 2,304 SF Starbucks Shell. Construction to be a wood framed shell with brick, EIFS and storefront facade. 

All questions are due to NGC by April 23rd @ 12pm. 

Project Documents

Post Date Bid Date Start Date Completion Date
April 06, 2018 May 01, 2018 @ 2:00 PM May 15, 2018 Sept 30, 2018

Holiday Inn Express - Durango, CO - Civil Re-bid

Scope of Work

Project to consists of earthwork and utility work.

Questions are due to NGC by 4/13/2018 @ 12pm CT.

Structural package due at a later date

Project Documents

Post Date Bid Date Start Date Completion Date
April 9, 2018 April 20, 2018 @ 2:00 PM See Schedule See Schedule

Holiday Inn Express - Durango, CO - Building Package

Scope of Work

BP 1 - Construction staking and surveying work, BP 2 - Testing Services, BP 3 - Termite Control Work Scope, BP 4 - Temporary Construction Fencing Work Scope, BP 5 - Site Asphalt Paving, BP 6 - Site Concrete Paving, BP 7 - Building and Site Footings and Foundations, BP 8 - Building Slabs, BP 9 - Reinforcing Steel (Supply), BP 10 - Gyp-Crete, BP 11 - Unit Masonry, BP 12 - Adhered Stone Veneer, BP 13- Structural & Miscellaneous Steel Fabrication, BP 14 - Structural & Miscellaneous Steel Erection, BP 15 - Grouting, BP 16 - Aluminum Railings (Supply), BP 17 - Aluminum Railings (Install), BP 18 - Decorative Metal Panels (Supply), BP 19 - Decorative Metal Panels (Install), BP 20 - Wood Framing and Rough Carpentry Supply, BP 21 - Wood Framing and Rough Carpentry Install, BP22 - Public Areas & BOH Architectural Wood Casework, Interior Millwork, And Plastic Fabrications, BP 23 - Guestrooms Architectural Wood Casework, Interior Millwork, And Plastic Fabrications, BP 24 - Finish Carpentry Install, BP 25 - Perimeter Foundation Drainage, BP 26 - Foundation Waterproofing, BP 27 - Parking Deck Sealants, BP 28 - Batt & Loose Fill Insulation, BP 29 - Fluid-Applied Air Barrier, BP 30 - EIFS, BP 31 - Fiber Cement and Wood Siding, BP 32 - Membrane Roofing, BP 33 - Intumescent Fireproofing (Painting), BP 34 - Spray Fireproofing, BP 35 - Spray Insulation, BP 36 - Joint Sealants, BP 37 - Expansion Joint Covers Supply, BP 38 - Doors, Frames, & Hardware, BP 39 - Door Access Control, BP 40 - Overhead Doors, BP 41 - Aluminum Entrances & Storefronts, BP 42 - Windows & Patio Doors, BP 43 - Shower Doors Supply, BP 44 - Shower Doors Install, BP 45 - Drywall, BP 46 – ACT,  BP 47 - Tile, BP 48 - Carpet & Resilient Flooring, BP 49 - Painting & Wall Covering, BP 50 - Toilet Accessories (Supply), BP 51 - Fire Extinguishers & Cabinets (Supply), BP 52 - Bike Racks 
BP 53 - Benches, BP 54 - Outdoor Fire Pit, BP 55 - Marble Shower Surrounds Supply, BP 56 - Marble Shower Surrounds Install, BP 57 - Quartz & Solid Surface Supply, BP 58 - Quartz & Solid Surface Install, BP 59 - Pool, BP 60 - Linen Chute, BP 61 - Elevator, BP 62 - Fire Suppression, BP 63 - Plumbing, BP 64 - HVAC, 
BP 65 - Electrical, BP 66 - Communications, BP 67 - Lot Cleaning/Striping Work, BP 68 - Boulder Retaining Walls, BP 69 - MSE Retaining Wall, BP 70 - Landscaping, BP 71 - Planters (Supply), BP 72 - Irrigation 

Project Documents

Post Date Bid Date Start Date Completion Date
April 20, 2018 May 03, 2018 @ 2:00 PM See Schedule See Schedule

AMI - ASC, Link and Office Additions

Scope of Work

The project consists of the construction of two new buildings and a connecting link between the existing building and the new buildings. Separate prices will be requested for each building.  Building 1 contains approximately 6,289 sf and will house administrative office functions and the connecting link. Building 2 contains approximately 11,597 sf and houses the ambulatory surgical center (ASC) functions.

Project Documents

Post Date Bid Date Start Date Completion Date
April 20, 2018 May 17, 2018 @ 2:00 PM June 6, 2018 May 6, 2019

Testimonials

Don't just take our word for it...

We have built our business on client-driven satisfaction. We believe in doing with, instead of doing for. For us, it is not just about delivering service but building partnerships with our clients to positively impact our communities for years to come.

  • Wendy Birdsall, Lincoln Chamber of Commerce

    NGC not only builds the highest quality of buildings but does so with great integrity.

  • Adam Criswell, Speedway Properties

    From the day they started the project to the day they finished, NGC personnel were professional, ethical, schedule driven and totally focused on our satisfaction. They are truly committed to constructing the finest possible building and they accept nothing short of this from their sub-contractors. Every concern we had was addressed quickly and thoroughly.

  • Patrick Phelan, DLR Group

    NGC's qualified team provided pre-planning with the ownership and DLR Group prior to construction as well as regular meetings and communication with the design team and subcontractors throughout the project. Their coordination efforts helped resolve the common day-to-day challenges of a commercial project of this character by utilizing technology and sound judgement.

  • Steven Hopper, Shamrock Development

    Their true open book approach to costs, information, and prudent reviews with the design team not only helped keep the project in line with budget and vision, but it also allowed construction to begin four months earlier than traditional methods. Their team provided a seamless transition from preconstruction into the actual construction phase.

  • Steve Schmidt, Frontier Bank

    What a pleasure it was to work with NGC! The crew was absolutely great and I truly appreciate their attention to timelines. The weekly reports via email were beneficial and informative as well.

  • Cara Mouw, University of Nebraska Medical Center

    Kudos to the NGC crew. The guys were so nice and easy to work with. We are very pleased with the work and progress so far.

  • Patrick Falke, Project Harmony

    Our project turned out exactly how it was promised, ahead of schedule and it looks amazing. Our staff was pleased with the cleanliness and helpful nature of your construction crew.

Lincoln Office
Phone 402.261.5489
Office Fax 402.261.5461
Bid Fax 888.375.1149
Lincoln Office
1000 "O" Street, Suite 102
Lincoln, NE 68508
Phone 402.261.5489
Office Fax 402.261.5461
Bid Fax 888.375.1149
Omaha Office
17310 Wright Street, Suite 104
Omaha, NE 68130